<nobr id="j75df"><sub id="j75df"><menuitem id="j75df"></menuitem></sub></nobr>

        <noframes id="j75df">

      <var id="j75df"></var>
      <listing id="j75df"><delect id="j75df"></delect></listing>

      <font id="j75df"></font>

      <menuitem id="j75df"></menuitem>

      咨詢服務 培訓服務
        肯達信服務熱線 CTS 統一客服電話
      400-690-0031
       
       
      首頁>咨詢服務>TARGET驗廠咨詢
      TARGET驗廠咨詢----TARGET生產能力與質量管理體系審核清單

       

      TARGET CORPORATION PRODUCTION SERVICES
       
       
       
       
      FACTORY PROFILE AND EVALUATION
       
      HARDLINES
       
       
       
       

      VENDOR: Prejecting 2500 Ltd
       
      EVALUATOR:      
      REP:  Helen Au Yeung
       
      DATE: (mm/dd/yy) 22 Feb, 2006
      TITLE: Director
       

       
      Note: Items with “PT” should be done as part of plant tour.
       
       
      PLANT INFORMATION
       

      1.NAME: Taizhou Rival Arts Co., Ltd
       
      CONTRACTOR:
      2.ADDRESS: North Town Section West Industrial,
       
      IF YES, LIST THE NAME OF CONTRACTORS:
      Development Zone, Huangyan, Taizhou, Zhejiang
       
           
           
       
           
      3.TELEPHONE NUMBER: 86-0576-4056288
       
           
           
       
           
      4.FAX NUMBER: 86-0576-4067222
       
           
      5.CONTACT PERSON: Pan Xiaohong
       
       
           
       
       
      6.E-MAIL ADDRESS: tzrfgy@163.com
       
       
           
       
      SCORE:        

       
       
       
       
      Area I - BUSINESS PRACTICES AND ADMINISTRATION:
      (* A negative answer will equal an automatic failure)
       
       

      7.
      DOES THE PLANT CONFIRM IT COMPLIES WITH:
       
      a.
      LOCAL\NATIONAL ENVIRONMENTAL LAWS *
       
      b.
      LOCAL\NATIONAL OCCUPATIONAL SAFETY LAWS *
       

       

      8.
      DOES THE PLANT HAVE :
       
      a.
      CLEAR AISLES?   *     PT
       
      b.
      ARE THERE CLEAR EMERGENCY EXITS ON EACH FLOOR?   *   PT
       
      c.
      ARE THEY UNLOCKED?   *
       
      d.
      ARE THEY ACCESSIBLE?   *
       
      e.
      FIRE FIGHTING EQUIPMENT IN PROXIMITY OF WORK AREA?   *   PT
       
      f.
      FIRST AID EQUIPMENT ON PROXIMITY OF WORK AREA?    * PT
       
      g.
      TRAINED MEDICAL PERSONNEL?      PT
       

       

      9.
      IS RESIDENTIAL HOUSING PROVIDED?      PT
       
      a.
      DOES IT COMPLY WITH PT 8?   *
       

       

      10.
      WHAT IS THE MINIMUM WORKING AGE? 18      YEARS
       
       
      DOES IT COMPLY WITH LOCAL, NATIONAL MINIMUM AGE LAWS? (TC REQUIRES A MINIMUM OF 14
       
       
      OR OLDER)   *
       
       
       
       
      11.
      WHAT IS THE MINIMUM WAGE (US$)?
       
       
      SKILLED LABOR:HR\WK\MO    610RMB
       
       
      UNSKILLED LABOR:HR\WK\MO     610RMB
       
       
      DOES IT COMPLY WITH LOCAL AND\OR NATIONAL MINIMUM WAGE LAWS?   *
       
       
       
       
      12.
      WHAT ARE THE NORMAL WORKING HOURS?
       
       
      PER DAY:           PER WEEK:      
       
       
       
       
      13.
      WHAT IS THE EMPLOYEE HEADCOUNT?
       
       
      TOTAL PLANT: QTY:      
       
       
      TOTAL QA: QTY:      
       
       
       
       
      14.
      DO YOU MANUFACTURE IN CA OR NY?
       
      a.
      DO YOU HAVE A BUSINESS LICENSE?   *
       
       
      IF YES, PLEASE ATTACH A COPY.
       
       
       
       
      15.
      STAFFING RATIO:
       
      a.
      TOTAL PRODUCTION WORKERS           RATIO      
       
      b.
      INDUSTRIAL ENGINEERS           RATIO      
       
      c.
      MECHANICS           RATIO      
       
      d.
      IN-LINE QA AUDITORS           RATIO      
       
      e.
      PRODUCTION SUPERVISORS           RATIO      
       
      f.
      INDIRECT AND OTHER SUPPORT           RATIO      
       
      g.
      PRODUCTION SQUARE FOOTAGE            RATIO      
       
       
       
       
      16.
      IS THE BUILDING STEEL OR MASONRY?
       

       
       
       
       
      Area II – MANUFACTURING
      Total Points: 30
       
       
       
       
      A. FACILITIES
       
       

      17.
      ARE AVAILABLE MACHINES\EQUIPMENT\FIXTURES SUITABLE TO PRODUCE CLIENT'S
       
       
       
      PRODUCT?     PT
      2 pts.
       
       
       
       
       
      18.
      ARE MACHINES\EQUIPMENT PERIODICALLY MAINTAINED, CALIBRATED, AND CHECKED?
      2 pts.
       
       
       
       
       
      19.
      DOES THE FACTORY POSSESS A STRONG MAINTENANCE TEAM?
      2 pts.
       
       
       
       
       
       
       
       
       
      20.
      IS THE TOTAL PRODUCTION MACHINERY OPERATED UNDER A MAINTENANCE SCHEDULE?
      2 pts.
       
       
       
       
       
       
       
       
       
      21.
      ARE INJECTION, ROTOCAST MOLDS, SPRAYING MASKS STORED TO AVOID RUST OR BEING
       
       
       
      WORN OUT?      PT
      2 pts.
       
       
       
       
       
      22.
      LIST MAJOR MACHINERY\UTILITIES IN FACTORY ON A SEPARATE PAGE (INCLUDE NUMBER
       
       
       
      OF UNITS AND AGE)
       
       
       
       
       
       
       
       
       
       
       
      SUB-TOTAL:
           
      / 10

       
       
       
      B. COMMUNICATION & DOCUMENTATION CONTROL :
       
       

      23.
      DO FACTORY’S MANAGEMENT AND KEY STAFF UNDERSTAND ENGLISH SUFFICIENTLY TO
       
       
       
      ENSURE COMMUNICATION ?
      2 pts.
       
       
       
       
       
      24.
      IS THERE AN ADEQUATE AND FORMAL SYSTEM FOR RECEIVING PURCHASE ORDERS?
      1 pt.
       
       
       
       
       
      25.
      IS THERE AN ADEQUATE AND FORMAL SYSTEM FOR RECEIVING AND APPLYING
       
       
       
      DRAWINGS, PROCEDURES, DESIGN CHANGE, ETC., CORRECTLY?
      1 pt.
       
       
       
       
       
      26.
      ARE DRAWINGS, RECORDS, AND SPECIFICATIONS EASILY AVAILABLE THAT REFLECT A
       
       
       
      HISTORY OF CHANGES?
      1 pt.
       
       
       
       
       
      27.
      IN THE CASE OF AUTHORIZED SUBCONTRACTING, DOES FACTORY PROVIDE ADEQUATE
       
       
       
      SUPERVISION AND SPECIFICATIONS TO ENSURE THE COMPLIANCE TO THE
       
       
       
      REQUIREMENTS OF CLIENT’S STANDARDS?
      2 pts.
       
       
       
       
       
      28.
      DOES FACTORY HAVE CLEAR INSTRUCTIONS TO ITS DEPARTMENTS TO DELEGATE
       
       
       
      AUTHORITY TO STOP PRODUCTION IF THE PRODUCTS DO NOT MEET REQUIREMENTS OF
      2 pts.
       
       
      CLIENT’S STANDARDS?
       
       
       
       
       
       
      29.
      DOES FACTORY WORK CLOSELY AND EFFICIENTLY WITH CLIENT ON THE ASSIGNED
       
       
       
      PROJECT TO ADVISE AND DISCUSS ANY FAILURE ON PROCESSING PROBLEMS?
      1 pt.
       
       
       
       
       
       
       
       
       
       
      SUB-TOTAL:
           
      /10

       
       
      C. PACKING:
       
       

      30.
      IS THE PACKING AREA TIDY AND FREE OF CONTAMINATION?      PT
      1 pt.
       
       
       
       
       
      31.
      IS THERE ADEQUATE SAFEGUARD TO PREVENT ANOTHER COMPANY'S PRODUCTS FROM
       
       
       
      BEING PACKED INTO MASTER CARTON?
      1 pt.
       
       
       
       
       
      32.
      IS THERE ADEQUATE CONTROL TO PREVENT ANY DEFECTIVE OR REJECTED PRODUCTS
       
       
       
      FROM BEING PACKED INTO MASTER CARTON?
      1 pt.
       
       
       
       
       
       
       
       
       
       
       
       
       
      33.
      ARE FINAL FINISHED PRODUCTS WELL SEGREGATED FROM SEMI-FINISHED PRODUCTS IN
       
       
       
      THE PACKING AREA?      PT
      1 pt.
       
       
       
       
       
      34.
      ARE FINISHED PRODUCTS PACKED OR PROPERLY STORED IMMEDIATELY TO AVOID DUST
       
       
       
      AND DIRT?      PT
      1 pt.
       
       
       
       
       
      35.
      ARE PRODUCTS PASSED THROUGH METAL DETECTORS BEFORE PACKING?
      1 pt.
       
       
      (ONLY APPLICABLE TO PRODUCTS WITHOUT METAL COMPONENTS OR CHILDREN
       
       
       
      PRODUCTS)
       
       
       
       
       
       
      36.
      ARE PACKED MASTER CARTONS STORED IN A COVERED AREA OR A GOOD SHELTER TO
       
       
       
      KEEP FROM SUNSHINE AND TO AVOID BEING FLOODED OR RAINED UPON?
      1 pt.
       
       
       
       
       
       
       
       
       
       
      SUB-TOTAL :
           
      / 7

       
       
       
      D. NON-CONFORMING MATERIALS:
       
       

      37.
      IS NON-CONFORMING MATERIAL PROPERLY SEGREGATED AND IDENTIFIED AT ALL
       
       
       
      STAGES?      PT
      1 pt.
       
       
       
       
       
      38.
      ARE ADEQUATE RECORDS MAINTAINED TO SHOW THE STATUS OF SUCH NON-
       
       
       
      CONFORMING MATERIALS?
      1 pt.
       
       
       
       
       
      39.
      DO RECORDS SHOW THAT REWORKED PARTS\ MATERIALS HAVE BEEN REINSPECTED TO
       
       
       
      COMPLY WITH STANDARDS?
      1 pt.
       
       
       
       
       
       
       
       
       
       
      SUB-TOTAL:
           
      / 3

       
       
       
      Area III – QUALITY
      Total Points: 70
       
       
       
      A. SYSTEMS
       
       

      40.
      IS THERE A FORMAL QA PROGRAM?
      10 pts.
       
       
      (WRITTEN PROCEDURES BEING USED, RECORDS OF DEFECT LEVELS,DCL'S)
       
       
       
       
       
       
      41.
      IS THERE IN-PROCESS QUALITY CONTROL?
      1 pt.
       
       
       
       
       
      42.
      ARE DEFECT RECORDS KEPT?
      4 pts.
       
       
      MACHINE:             
       
       
       
      OPERATOR:          
       
       
       
      FINAL:                    
       
       
       
       
       
       
      43.
      IS THERE QC SUPERVISOR\MANAGER ON ALL SHIFTS?
      5 pts.
       
       
       
       
       
      44.
      IS QA INDEPENDENT OF PRODUCTION?
      5 pts.
       
       
       
       
       
       
       
       
       
      45.
      ARE THERE FORMAL TRAINING PROGRAMS?
      3 pts.
       
       
      OPERATOR:           
       
       
       
      INSPECTION:         
       
       
       
      MECHANIC      :      
       
       
       
       
       
       
      46.
      DO YOU INSPECT TO A STANDARD AQL?
      4 pts.
       
       
      WHAT IS YOUR AQL?    0,2.5,4.0
       
       
       
       
       
       
      47.
      WHAT IS THE PERCENT OF SECONDS?          
       
       
       
       
       
       
      48.
      ARE PRODUCT SPECIFICATIONS BEING USED?
      1 pt.
       
       
      BY WHOM?         
       
       
       
       
       
       
      49.
      ARE PACKAGING SPECIFICATIONS BEING USED?
      1 pt.
       
       
      BY WHOM?         
       
       
       
       
       
       
      50.
      SHADE CONTROLS?
      1 pt.
       
       
       
       
       
      51.
      ARE THE FACTORY'S QC PERSONNEL CERTIFIED BEFORE THEY PERFORM THEIR JOB AS
       
       
       
      OUTLINED IN THE QC PROCEDURE?
      1 pt.
       
       
       
       
       
      52.
      DOES THE FACTORY USE INTERNATIONAL, NATIONAL, CLIENT'S, OR ITS OWN APPROVED
       
       
       
      STANDARDS TO PERFORM IN-HOUSE QUALITY CONTROL?
      1 pt.
       
       
       
       
       
      53.
      DOES FACTORY HAVE A DETAILED WRITTEN PLAN DEMONSTRATING HOW SAFETY
       
       
       
      REQUIREMENTS ON PRODUCTS ARE CHECKED IN HOUSE?
      1 pt.
       
       
       
       
       
      54.
      DOES QC FULLY UNDERSTAND FACTORY'S QUALITY POLICY AND THE IMPORTANCE OF
       
       
       
      THE QUALITY ASSURANCE CONCEPT?
      1 pt.
       
       
       
       
       
      55.
      DOES QC HAVE ADEQUATE BASIC KNOWLEDGE AND EXPERTISE ON PRODUCTS TO BE
       
       
       
      MADE AND GENERAL MANUFACTURING TECHNOLOGY?
      1 pt.
       
       
       
       
       
       
       
       
       
       
      SUB-TOTAL:
           
      / 40

       
       
       
      B. PRODUCT PERFORMANCE TESTING:
       
       

      56.
      DO YOU HAVE ON-SITE TESTING?      PT
      5 pts.
       
       
       
       
       
      57.
      ARE RECORDS KEPT?
      5 pts.
       
       
      BY WHOM?         
       
       
       
       
       
       
       
       
       
       
       
      SUB-TOTAL:
           
      / 10

       
       
       
      C. INCOMING INSPECTIONS:
       
       

      58.
      HAS THE FACTORY TAKEN ADEQUATE MEASURES TO ASSURE RAW MATERIALS
       
       
       
      CONFORM TO REQUIRED SPECIFICATIONS BEFORE USE?
      1 pt.
       
      59.
      ARE INCOMING AND OUTGOING RAW MATERIALS MONITORED AND DOCUMENTED?
      1 pt.
       
       
       
       
       
      60.
      ARE RAW MATERIALS KEPT IN CONTROLLED STOREROOMS TO AVOID THEFT, LOSS, AND
       
       
       
      DETERIORATION?
      1 pt.
       
       
       
       
       
      61.
      ARE RAW MATERIALS, IF NECESSARY, INSPECTED BEFORE PRODUCTION? ARE
       
       
       
      RECORDS TRACEABLE? IS THE INSPECTION SAMPLING SCHEDULE ADEQUATE?      PT
      1 pt.
       
       
       
       
       
      62.
      ARE THERE WRITTEN RAW MATERIAL INSPECTION INSTRUCTIONS AVAILABLE AS
       
       
       
      GUIDELINES TO INSPECTORS?
      1 pt.
       
       
       
       
       
       
       
       
       
       
      SUB-TOTAL:
           
      / 5

       
       
      D. FINAL INSPECTIONS:
       
       

      63.
      DOES FACTORY'S QC PERFORM INTERNAL FINAL RANDOM INSPECTION (FRI)?
      5 pts.
       
       
       
       
       
      64.
      ARE INTERNATIONAL, CLIENT'S, OR OTHER APPROVED STANDARDS USED?
      1 pt.
       
       
       
       
       
      65.
      ARE THERE WRITTEN FORMAL INSPECTION REPORTS AND FILED FOR REVIEW?
      1 pt.
       
       
       
       
       
      66.
      ARE CUSTOMER DRAWINGS\SPECIFICATIONS READILY AVAILABLE FOR QUALITY
       
       
       
      CONTROL OR ENGINEERING DEPARTMENT ON REQUEST?
      1 pt.
       
       
       
       
       
      67.
      IS THE SAMPLING SIZE OF PRODUCTS FOR FINAL INSPECTION SUFFICIENT FOR A
       
       
       
      STATISTICAL ANALYSIS OF THE QUALITY OF MERCHANDISE?
      1 pt.
       
       
       
       
       
      68.
      ARE THERE PROCEDURES TO REQUIRE ACCEPTABLE INSPECTION REPORTS TO
       
       
       
      AUTHORIZE THE SHIPMENT OF THE PRODUCTS?
      1 pt.
       
       
       
       
       
      69.
      DOES FACTORY PERFORM 100% OR STATISTICAL CHECK ON FUNCTIONALITY?
      5 pts.
       
       
       
       
       
       
       
       
       
       
      SUB-TOTAL:
           
      / 15

      SA8000

      SA8000. 社會責任管理體系認證咨詢項目
      點擊查看

      WAL-MART

      WAL-MART. 沃爾瑪客戶驗廠咨詢項目
      點擊查看

      ISO20000認證咨詢

      ISO20000. IT服務管理體系國際標準認證咨詢介紹
      點擊查看
      客服中心
      楊老師
      王老師
      徐老師
      郭小姐
      張小姐
      陳老師
      您好,我是肯達信管理顧問公司客服,歡迎咨詢!

      楊老師

      您好,我是肯達信管理顧問公司客服,歡迎咨詢!

      王老師

      您好,我是肯達信管理顧問公司客服,歡迎咨詢!

      徐老師

      您好,我是肯達信管理顧問公司客服,歡迎咨詢!

      郭小姐

      您好,我是肯達信管理顧問公司客服,歡迎咨詢!

      張小姐

      您好,我是肯達信管理顧問公司客服,歡迎咨詢!

      陳小姐


      客戶服務熱線

      400-690-0031

      24小時熱線

      18576401396


      展開客服
      免费观看一级电影